Buyer’s Guide
Hail Impact Resistance and IEC 61215 Testing for Bulk Solar Panel Orders
1000containers Team, November 24, 2026, 6 min read

Hail damage shows up in insurance claims and warranty disputes long after modules are installed, which makes it one of the few failure modes worth specifying against before you place an order rather than discovering after a storm season. This sits alongside the other certification checks covered in our wholesale buying guide as a regional, not universal, requirement.
The baseline test every certified module already passes
IEC 61215, the design qualification standard most grid-connected crystalline silicon modules are certified against, includes a hail impact test under its MQT 17 procedure. The baseline requirement fires a 25 millimeter ice ball at a module's surface at 23.0 meters per second, roughly 51 miles per hour, and checks for visible defects and wet leakage current afterward. Any module carrying a standard IEC 61215 certification has already passed this minimum test, so it is not something you need to ask a Tier 1 supplier to add.
Why the baseline test is not the same as a hail-prone region rating
The 25 millimeter minimum corresponds to roughly one inch hail, a common but not extreme event. For projects sited in parts of the central United States, portions of Europe, Australia, and parts of China where larger hail is a known recurring risk, the standard allows testing at larger ice ball diameters, with the test report required to state exactly which diameter and velocity were used. A module tested and passed at 45 millimeters or larger gives a materially higher confidence level for a hail-prone site than one tested only at the 25 millimeter floor.
How the test itself works
Ice balls must be free of visible cracks and within 5 percent of the required diameter and mass before the test begins
Balls are stored at a controlled sub-freezing temperature and must strike the module within 60 seconds of leaving storage
Eleven separate impact locations are tested per module, with the launcher's velocity held within 5 percent of the stated target
After impact, the module undergoes a visual inspection and a wet leakage current test, and passes only if it shows no major defects and meets the original electrical safety requirements
What to ask for when specifying modules for a hail-prone region
Request the actual test report, not just a certificate summary, and check the stated ice ball diameter and velocity rather than assuming a passing IEC 61215 result automatically covers larger hail. If your project sits in a region with a documented history of large hail events, ask whether the manufacturer has tested at 35 or 45 millimeters and whether that data is available for the specific product line you are ordering rather than a related model.
Frequently asked questions
Does a higher hail rating cost more per watt?
Not necessarily as a line item, since many Tier 1 manufacturers test flagship product lines at higher ice ball diameters as a matter of course. The cost impact, if any, usually shows up in which specific product line or glass configuration is available rather than a separate hail surcharge.
Is a thicker front glass automatically more hail resistant?
Glass thickness is one factor among several, including glass type and frame design, so a thicker glass sheet is not a reliable substitute for an actual MQT 17 test result at the diameter relevant to your site.
Should every project specify the higher hail rating regardless of location?
Not necessarily. For a site with no meaningful hail history, the standard 25 millimeter certification that every IEC 61215 module already carries is generally sufficient, and specifying unnecessarily high ratings can narrow your supplier and pricing options without a corresponding benefit.